public/wp2.txt · Last modified: 2012/03/30 08:45 by testor



Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:wp2 [2012/01/24 14:47]
testor
public:wp2 [2012/03/30 08:45] (current)
testor
Line 1: Line 1:
 ====== WP2: Integration in the GOOS ====== ====== WP2: Integration in the GOOS ======
 +
 +The tasks in WP2 will analyse the three preparatory actions (vision statement of the ESF Marine Board) in respect to creating and maintaining a sustainable glider component in GOOS. The synergy effects will be assessed with other observatories in GOOS, namely Argo profiling floats, Moorings, Ships, and Satellites. The financial as well as the legal aspects of a sustainable glider component in GOOS will be analysed. Moreover, the available legal framework to set up such a component in Europe will be reflected on. The results of this
 +work package will be a direct contribution to the assessment done in WP1.
 +
 =====Task 2.1. Assessment of a glider component in the GOOS===== =====Task 2.1. Assessment of a glider component in the GOOS=====
 (responsible:​ IFM-GEOMAR, contributors:​ NURC, NERSC, HCMR, AWI, UIB, SAMS, FMI,UPMC, OGS) (responsible:​ IFM-GEOMAR, contributors:​ NURC, NERSC, HCMR, AWI, UIB, SAMS, FMI,UPMC, OGS)
 





Recent changes RSS feed